exterior+park_building.jpg
 

GENESIS 5CC AT SEAPORT DISTRICT

Genesis 5 Channel Center (5CC) is a unique brick & beam conversion opportunity offering +/-52,000 SF Class A laboratory and office space in the highly sought after Seaport submarket. Located 5 minutes from the MBTA Broadway Red Line Station, this 6-story building is easily accessible from South Station, Downtown Boston and Cambridge and steps from numerous amenities. Since the acquisition of the building by Phase3 Real Estate Partners, Inc., the building has been repurposed for life science use. GENESIS 5CC will allow fast growing life science companies access to top tier laboratory & office space, steps from Boston’s booming Seaport district.

INNOVATION AWAITS AT GENESIS

 

icon.png

±52,000 RSF

Class A Life Science Development

Brick and Beam Conversion

Multi-Tenant Building

±10,500 RSF Floor Plates

icon2.png

SEAPORT DISTRICT

Close proximity to Desirable Amenities

Easy Access to MBTA Red T Line

Cutting-edge dining, retail, fitness & entertainment

icon3.png

DELIVERY

Spec Suites Move-In Ready

Robust MEP Systems Accommodate Laboratory Standards

Pre-designed Lab & Lab Support Features Throughout

 
 

Click the thumbnail images below to view larger.

5CC_AerialWebsite.jpg
 

Experience the Difference

Access Boston Proper – And Investors – With Ease

Boston breeds innovation and discovery. Genesis 5CC is located in the emerging Seaport Life Science Submarket and only a few Red Line Stops away from the top life science cluster in the U.S. Proximity allows for connection and colutivaiton within the life science community.

 
 


Icon_2_.png

Logan Airport

8 Minutes

Icon_2_2.png

South Station

4 Minutes

Icon_2_3.png

Kendall Square

12 Minutes

Icon_2_5a.png

Seaport Waterfront

6 Minutes

 

_DSC9625_26_27_28_29_30_31.jpg

 

FIVE COMPONENTS - endless options

Every GENESIS suite is equipped with an industry standard, modular benching system. This system minimizes downtime and maximizes flexibility. The 5-component system is pre-plumbed and pre-wired for fast installation and effortless reconfiguration. Add components and rearrange overnight.

 

 
 
Icon_3_.png

Adjustable Height Work Surfaces


Adaptable to almost any work
environment and constructed with a welded metal frame to provide stability to the most
sensitive instruments.

Icon_3_2.png

Mobile
Cabinets


Combine any number of
cabinets to customize storage.


Icon_3_3.png

Adjustable Shelving Unit


Bolts to any adjustable height table to offer 2 or 3 levels of shelving. Half-length units also available.

Icon_3_4.png

Service Unit


The core component, designed to accommodate up to 7 lab gasses and 12 electrical circuits per unit.

Icon_3_5.png

Fume Hoods


Each suite is capable of accommodating various sized fume hoods ranging from 4 to 8 feet.

 

Click the thumbnail images below to view larger.

vacant+ii.jpg

For Leasing and Project Information


 

ERIC SMITH
CBRE
Executive Director
+1 617.933.0176
eric.smith2@cbre.com

MCKENNA TEAGUE
CBRE
Leasing Manager
+1 617.936.2295
mckenna.teague@cbre.com

TESS CHANDLER
CBRE
Executive Managing Director
+1 617.439.7812
tess.chandler@cbre.com